VMware workloads can move to OCI without refactoring the application stack, while dry-run evidence, target mapping, cutover sequencing, and rollback assumptions stay visible.
Optional VMware source discovery
When additional planning evidence is useful, optional VMware source discovery can validate read-only vCenter/ESXi inventory visibility, candidate VM evidence, and basic datastore and network context.
OCI target operating model
OCI delivery brings tenancy access, network mapping, storage placement, validation evidence, and recovery or cutover readiness into a single planning model.
Controlled migration, with validation and rollback planning
The operating method is framed around migration control: assessment, preparation, dry-run, cutover, validation, and rollback planning.